Algola 200TPH Diamond Washing & Separation Plant
Raw Material: 0-200mm Raw Diamond Ore with sticky mud
Designed Capacity: 200 TPH (ton per hour)
Main Equipment: Trommer scrubber, high frequency vibrating screen, jig separator, ore feeder, belt conveyor, etc.
Project Introduction
There are sticky mud in raw diamond ore. Particle size of diamond is 2-30mm. The Angola customer want to separate 2-5mm, 5-10mm, 10- 30mm, then let jig machine to separate concentrate diamond.
After using our equipment, this customer needed to open a similar diamond washing plant at the following year. The customer did not hesitate to choose us, and is the same program. Thanks to the trust and support of our customers, our profession is worth your choice.
Diamond Wash Plant Processing Flow
Process: First use vibration feeder to feeding material to trommel scrubber, After trommel scrubber for washing clean, and separator big size out, then to vibration screen. Vibration screen also for separator different size.
This process for Angola clay diamond separator line. The capacity is for 200 tons per hour, First use backhoe get material to hopper, under hopper have a vibration feeder, vibration feeder can separator out +70mm size, then 0-70mm size to trommel scrubber, trommel scrubber is had two part, one part scrubber is for washing, one part screen is for separator different size. After trommel scrubber then to vibration screen, separator size again then can use jig machine get diamond.
Trommel scrubber is good for clay mine washing, some mine have much clay, if not washing first, the recovery rate is very lower. The trommel scrubber is fit for clay mine washing, it can’t recover the concentration, trommel scrubber is fit for all clay mine, like gold, diamond, tin, chrome, tantalum-niobium ores and so on.
This 200 tons per hours diamond separator line is have working for one year, and it has got good effect, for now, this customer want to open another 200 tons per hours line, our engineer have to go mine site for inspect, first can check the existing line, most things are good, but also some details can make more perfect, Our factory is a progress factory, we need to make the machine more and more perfect, besides checking the existing line, also need to check the new line, base the one new ore site, to choose the best machine.
Equipment List of this 200 tph diamond wash separation plant
Related Products
Trommel Scrubber
Hydrocyclone
Vibrating Screen
Belt Conveyor
Other Cases
Ghana 200TPH Alluvial Gold Washing Plant
Zambia 100TPH Copper Processing Plant
Ghana 100TPH Alluvial Gold Processing Plant