350TPH Iron Sand Washing Plant in Mexico
We guarantee the high quality machine in the mineral processing industry, established in 38 years of experience
![](https://mineraldressing.com/wp-content/uploads/ore-icon-20.png)
minerals
iron sand
![](https://mineraldressing.com/wp-content/uploads/capacity.png)
capacity
350TPH
in Mexico
![](https://mineraldressing.com/wp-content/uploads/sccff-ruler-icon.png)
feed size
0-5mm
![](https://mineraldressing.com/wp-content/uploads/request.png)
Customer's request
improve grade, and recover the iron as much as possible
process flow
1. Feeding & Screening: vibrating feeder, high-frequency screen
The material is transported to the high-frequency screen by the vibrating feeder and the belt conveyor, and the material is screened.
2. Washing & Dewatering: hydrocyclone, dewatering screen
+5mm material is transported to one side by belt conveyor as scrap. -5mm material is sent to the hydrocyclone by slurry pump, which is used to separate and remove the heavier coarse-grained mud sand and other substances in the sewage, and overflow into the dewatering screen for dewatering.
2. Tailings dewatering: dewatering screen, thickener
The material larger than 0.5MM is transported to the side with a belt conveyor to obtain iron ore. The 0-0.5mm material is pumped to the hydrocyclone with a sand pump, and the underflow of the cyclone is pumped to the dewatering screen with a sand pump to obtain iron ore. Then the overflow water enters the thickener to recover the tailings water.
Iron ore Processing Plant Solutions & Flow Design
Contact Us Now
Please fill out the information below for the quotation price and engineer’s help. We will reply ASAP!
Notice:
- We do not provide jobs and have no interest in investment or partnerships.
- We provide mineral processing equipment and solutions; not buy and sell mineral /ore /materials.
- We value your privacy and keep your information safe.